Mon - Friday 7:30 - 5:00pm
Saturday & Sunday: CLOSED
317 Rte 27
Raymond, NH 03077

Project Details

  • Duralift DPM-52
  • 57’ of Working Height
  • Insulated
  • Full Pressure HERC Single Stick Hydraulic Controls
  • 1000# Material Handling “Side Mounted” Pinnable/Telescopic Jib
  • 180 Degree Rotating 42”/2 man bucket
  • Bucket Elevator
  • Front  “A” Frame Outriggers
  • Brand FX Fiberglass Body
  • Aluminum Tailshelf
  • Curbside Access Stepway
  • Linex Coating in Load Bed and Compartment Tops
  • Freightliner “M2” Chassis 26,000# GVWR
  • Cummins Diesel

Project Description

Client name:
City of Bangor, Maine DPW
Location:
Bangor, ME
Completed:
Sept 2017